Established in 2008, the 293,88 ha Minh Hung III industrial park developed with its modern infrastructure, is considered as one of key industrial parks of Binh Phuoc province.
Hereby some detailed information and pictures upon infrastructure of Minh Hung III industrial park:
Entrance Gate
Administration office
Land use planned table
No. | Type of land use | Area (ha) |
Rate (%) |
1 | Land for construction of factories | 210,73 | 71,71 |
2 | Technical area | 5,22 | 1,78 |
3 | Administration and service area | 5,38 | 1,83 |
4 | Green area | 33,33 | 11,34 |
5 | Warehouses | 5,01 | 1,70 |
6 | Inner roads system | 33,95 | 11,55 |
7 | Residential area | 0,25 | 0,09 |
TOTAL | 293,88 | 100,00 |
Traffic system
Main road (N11) 51m width, inner roads 24~39m width, road load 30 tons, inner traffic system of the industrial park together with traffic system outside to form a comprehensive traffic system, most comfortable for transportation of goods.
Main road (N11) 51m width
Inner road 24~39m width
Electric power supply
Electricity 220kV supplied by Binh Phuoc Electric company limited, shall be connected to each enterprise’s fence & supported by 110/22kV substation.
Fresh water supply system
- Fresh water supply inside the industrial park with capacity of 9.000m3/day night.
Waste water treatment system
– Upon enterprises: waste water must be treated into level B in accordance with Vietnamese standardTCVN5949:2005 before being discharged into collective waste water system of the industrial park.
– Upon Minh Hung III industrial park: Equipped with waste water plant capacity of 8.550m3/day night, waste water treated into level A in accordance with Vietnamese standard TCVN5949:2005.
Telecommunication systems
Domestic & international telecommunication system meets investors’ needs as telephone, internet…